ANALISIS FAKTOR-FAKTOR PENYEBAB TIMBULAN LIMBAH MATERIAL PROYEK KONSTRUKSI
Sriwijaya University, 2021
B NAYOBI, B Susanti
Citation : 0
Year : 2021 |
ANALISIS PENGENDALIAN WAKTU DAN BIAYA MENGGUNAKAN METODE EARNED VALUE PADA PROYEK PEMBANGUNAN GEDUNG MAPOLDA SUMATERA SELATAN
Sriwijaya University, 2021
S ELVANDARI, B Susanti, I Juliantina
Citation : 0
Year : 2021 |
Operation and maintenance financial feasibility analysis of centralized domestic wastewater treatment system (case study: Palembang City Sewerage Project)
Przegląd Naukowy. Inżynieria i Kształtowanie Środowiska 30 (3 [93]), 2021
LK Estu, B Susanti, F Hadinata
Citation : 0
Year : 2021 |
PERHITUNGAN RENCANA ANGGARAN BIAYA PEMBANGUNAN KOLAM RETENSI KOMPLEK PERKANTORAN TERPADU KERAMASAN-KOTA PALEMBANG
Sriwijaya University, 2021
MI SYAHPUTRA, I Juliantina, B Susanti
Citation : 0
Year : 2021 |
Analysis of Domestic Wastewater Management Systems in Low Income Residential Areas
Sriwijaya Journal of Environment 5 (2), 92-102, 2020
DE Prasetyo, H Fitriani, B Susanti
Citation : 0
Year : 2020 |
PT PLN (Persero) Satisfaction Analysis towards Performance of The Contractor
ADRRI Journal of Engineering and Technology 4 (8 (3)), 1-15, 2020
EFP Daeli, MF Toyfur, B Susanti
Citation : 0
Year : 2020 |
Analisis Biaya Dan Pendapatan Operasional Sistem Pengelolaan Air Limbah Domestik Terpusat Skala Kota
Applicable Innovation of Engineering and Science Research (AVoER), 410-417, 2020
B Susanti, LK Estu, F Hadinata
Citation : 6
Year : 2020 |
Similarity: Sustainability Performance Of Building Construction Projects In Indonesia
Universitas Sriwijaya, 2020
B Susanti
Citation : 0
Year : 2020 |
Similarity: The Analysis of Barriers for Implementation of Sustainable Construction in Indonesia
Universitas Sriwijaya, 2020
B Susanti
Citation : 0
Year : 2020 |
Similarity Comparison Analysis Between Traditional and Long Segment Contracts on National Road Preservation Activities in Indonesia
Universitas Sriwijaya, 2020
B Susanti, I Juliantina
Citation : 0
Year : 2020 |