EVALUASI VOLUME PELEDAKAN OVERBURDEN DI PIT 3 TIMUR ELEKTRIFIKASI BANKO BARAT PT BUKIT ASAM, TBK. TANJUNG ENIM, SUMATRA SELATAN
Sriwijaya University, 2018
BR SYANIA, M Asyik, D Purbasari
Citation : 0
Year : 2018 |
ANALISIS PENGARUH PARAMETER KOMPAKSI DAN DAYA DUKUNG TANAH TERHADAP KECEPATAN HD 785 PADA JALAN BOA PT BUKIT ASAM (PERSERO) TBK
Sriwijaya University, 2018
AA MEILYAN, M Yusuf, D Purbasari
Citation : 0
Year : 2018 |
ANALISIS TINGKAT GETARAN TANAH (GROUND VIBRATION LEVEL) AKIBAT PELEDAKAN OVERBURDEN UNTUK MENCAPAI KONDISI AMAN TERHADAP KAWASAN PEMUKIMAN PENDUDUK DI PT. KUANSING INTI MAKMURÂ …
Sriwijaya University
A FAREZA, D Sudarmono, D Purbasari
Citation : 0
Year : 2018 |
PERENCANAAN KEBUTUHAN ALAT GALI MUAT DAN ANGKUT UNTUK MEMENUHI TARGET PRODUKSI LIMESTONE 1.000. 000 TON/TAHUN DI PIT 4142 PT. SEMEN INDONESIA (PERSERO) TBK SITE TUBAN, PROVINSIÂ …
Sriwijaya University
M MURSID, MT Toha, D Purbasari
Citation : 0
Year : 2018 |
KAJIAN TEKNIS PENGGALIAN BUCKET WHEEL DREDGE (BWD) KUNDUR I UNTUK MENCAPAI TARGET VOLUME PEMINDAHAN TANAH SEBESAR 110.000 M3/BULAN DI UNIT PRODUKSI LAUT BANGKA, PT. TIMAH Tbk
Sriwijaya University, 2018
F ATIKA, M Mukiat, D Purbasari
Citation : 0
Year : 2018 |
ANALISIS OVERALL EQUIPMENT EFFECTIVENESS UNTUK MENINGKATKAN WAKTU PRODUKSI BACKHOE DAN DUMP TRUCK PADA AKTIVITAS PENAMBANGAN DI PT. DIZAMATRA POWERINDO, LAHAT, SUMATERA SELATAN
Sriwijaya University, 2018
G MUHAMMAD, M Asyik, D Purbasari
Citation : 0
Year : 2018 |
EVALUASI KINERJA OPERASI PENGEBORAN DAN PELEDAKAN TERHADAP PRODUKTIVITAS EXCAVATOR DI QUARRY KARANG PUTIH PT. SEMEN PADANG, INDARUNG.
Sriwijaya University, 2018
R Meidiantoni, MT Toha, D Purbasari
Citation : 5
Year : 2018 |
ANALISIS TINGKAT GETARAN TANAH (GROUND VIBRATION LEVEL) AKIBAT PELEDAKAN OVERBURDEN UNTUK MENCAPAI KONDISI AMAN TERHADAP KAWASAN PEMUKIMAN PENDUDUK DI PT. KUANSING INTI MAKMURÂ …
Sriwijaya University, 2018
A FAREZA, D Sudarmono, D Purbasari
Citation : 0
Year : 2018 |
STUDI PEMANFAATAN TEKNOLOGI TERRESTRIAL LASER SCANNER UNTUK MENGHITUNG VOLUME PENGUPASAN OVERBURDEN DI PIT 2 ELEKTRIFIKASI BANKO BARAT PT. BUKIT ASAM, TBK. TANJUNG ENIMÂ …
Prosiding Temu Profesi Tahunan PERHAPI 1 (1), 47-60, 2018
ED Maharfi, T Arief, D Purbasari
Citation : 0
Year : 2018 |
PERENCANAAN KEBUTUHAN ALAT GALI MUAT DAN ANGKUT UNTUK MEMENUHI TARGET PRODUKSI LIMESTONE 1.000. 000 TON/TAHUN DI PIT 4142 PT. SEMEN INDONESIA (PERSERO) TBK SITE TUBAN, PROVINSIÂ …
Sriwijaya University, 2018
M MURSID, MT Toha, D Purbasari
Citation : 0
Year : 2018 |