GS Documents
Source by Sinta Kemenristek
Total : 48
Analisa Durasi dan Biaya Pembangunan Gedung Menggunakan Metode Fast Track Studi Kasus: Gedung Loka Kesehatan Masyarakat Palembang). Tugas Akhir …, 2019 N Jonanda Citation : 5 Year : 2019 |
PEMILIHAN BENTUK MODEL PENILAIAN RISIKO BENCANA GEMPA BUMI UNTUK RUAS JALAN NASIONAL DI INDONESIA Simposium II UNIID 2017 2 (1), 122-129, 2018 MF Toyfur, KS Pribadi, SS Wibowo, IW Sengara Citation : 0 Year : 2018 |
Vulnerability factor in earthquake risk assessment model for roads in Indonesia MATEC Web of Conferences 229, 03009, 2018 MF Toyfur, KS Pribadi, SS Wibowo, IW Sengara Citation : 6 Year : 2018 |
State of The Art Model Penilaian Risiko Bencana Gempa Bumi untuk Ruas Jalan di Indonesia Andalas Civil Engineering (ACE) Conference 2014, 2018 MF Toyfur Citation : 0 Year : 2018 |
Seismic risk assessment for road in Indonesia AIP Conference Proceedings 1730 (1), 2016 MF Toyfur, KS Pribadi Citation : 4 Year : 2016 |
ANALISIS KERUGIAN AKIBAT KERUSAKAN INFRASTRUKTUR JALAN DI DAERAH RENTAN BANJIR PADA DAS LAMBIDARO Sriwijaya University, 2011 E ERNILASARI, DDA Putranto, MF Toyfur Citation : 0 Year : 2011 |
OPTIMALISASI PRODUKTIFITAS TENAGA KERJA (STUDI KASUS: PROYEK KONSTRUKSI VENUES STADIUN UTAMA ATLETIK KOMPLEK OLAHRAGA JAKABARING PALEMBANG) Sriwijaya University, 2011 T AKBAR, MF Toyfur Citation : 0 Year : 2011 |
ANALISIS FENOMENA INTERAKSI ANTAR KOMPONEN JEMBATAN (STUDI: KASUS JEMBATAN MUSI II) Sriwijaya University, 2011 M MAHFUZ, MF Toyfur Citation : 0 Year : 2011 |
KAJIAN PENERAPAN SISTEM PENCEGAHAN KEBAKARAN PADA BANGUNAN TINGGI DI KOTA PALEMBANG Sriwijaya University, 2011 HM KUMAR, MF Toyfur Citation : 0 Year : 2011 |
PENGEMBANGAN MODEL DETERIORASI ANTAR KOMPONEN JEMBATAN (STUDI KASUS JEMBATAN AIR KERAMASAN) Sriwijaya University, 2010 R LAIMAN, MF Toyfur Citation : 0 Year : 2010 |