ANALISIS KETERCAPAIAN PRODUKSI OVERBURDEN BULAN OKTOBER-DESEMBER 2021 DI PT ULIMA NITRA SITE PT DUTA BARA UTAMA, MUARA ENIM, SUMATERA SELATAN
Sriwijaya University, 2022
A MAHARANI, MT Toha, D Purbasari
Citation : 0
Year : 2022 |
ANALISIS PENGARUH GRADE RESISTANCE DAN TIRE PENETRATION TERHADAP FUEL RATIO UNIT DUMP TRUCK PADA PENGANGKUTAN OVERBURDEN DI PT. BIMA PUTRA ABADI CITRANUSA
Sriwijaya University, 2022
RC SILITONGA, D Purbasari
Citation : 0
Year : 2022 |
PELATIHAN TEKNIK PEMBUATAN DAN PENGELOLAAN MESIN TETAS LISTRIK OTOMATIS
JURNAL PENGABDIAN SRIWIJAYA 10 (3), 1494-1501, 2022
D Purbasari
Citation : 0
Year : 2022 |
Identifikasi Potensi Air Tanah Untuk Kebutuhan Air Bersih Mesjid Dahlan Husin dan Masyarakat Sekitarnya di Kelurahan Talang Keramat, Kecamatan Talang Kelapa, Kabupaten Banyuasin
Applicable Innovation of Engineering and Science Research (AVoER) 14 (1Â …, 2022
E Ibrahim, RRY Bayuningsih, E Oktarinasari, D Purbasari
Citation : 1
Year : 2022 |
PENGOLAHAN PASIR SUNGAI MUSI SKALA LABORATORIUM UNTUK HILIRISASI PEMANFAATAN BAHAN BAKU INDUSTRI CONBLOCK
Sriwijaya University, 2022
M ZUHRI, A Rahman, D Purbasari
Citation : 0
Year : 2022 |
PENDAMPINGAN PETANI SAWIT DALAM MENYEDIAKAN BIBIT BERKUALITAS UNGGUL DAN MENINGKATKAN HASIL PRODUKSI TANDAN BUAH SEGAR DI KECAMATAN KELUANG KABUPATEN MUSI BANYUASIN SUMATERAÂ …
Applicable Innovation of Engineering and Science Research (AVoER) 14 (1), 65-71, 2022
R Pebrianto, D Purbasari, AP Gobel, MM Ibrahim, E Oktarinasari
Citation : 1
Year : 2022 |
EVALUASI KEMAMPUAN PRODUKSI RIPPING DOZER KOMATSU D 375 A-6 UNTUK MENCAPAI TARGET PENGUPASAN OVERBURDEN DI PT. DUTA TAMBANG REKAYASA SITE SEBAKIS & SEI MENGGARIS, KABUPATENÂ …
Applicable Innovation of Engineering and Science Research (AVoER) 14 (1), 2022
A Rahman, M Mukiat, D Purbasari
Citation : 0
Year : 2022 |
ANALISIS PENGARUH GETARAN HASIL PELEDAKAN TERHADAP KESTABILAN LERENG PADA PIT TSBC PT. BUKIT ASAM Tbk. TANJUNG ENIM SUMATERA SELATAN
Sriwijaya University, 2021
EVADWI ANGGRAINI, MT Toha, D Purbasari
Citation : 0
Year : 2021 |
DESAIN TEKNIS PELEDAKAN BATU KAPUR UNTUK MEREDUKSI EFEK GETARAN TANAH
Jurnal Pertambangan 5 (1), 33-37, 2021
A Suherman, D Purbasari
Citation : 0
Year : 2021 |
OPTIMALISASI TERHADAP OVERALL SLOPE KESTABILAN LERENG DISPOSAL PADA TAMBANG BATUBARA BANKO BARAT PIT 2 PT BUKIT ASAM TBK. SUMATERA SELATAN
Sriwijaya University, 2021
DH RAMADHAN, MT Toha, D Purbasari
Citation : 0
Year : 2021 |