photo
photo

BETTY SUSANTI

Teknik Sipil

NIDN/NIDK : 0004018001

Lektor Kepala

BETTY SUSANTI

Teknik Sipil

NIDN/NIDK : 0004018001

Lektor Kepala

H-INDEX

WoS H-Index : 0

Scopus H-Index : 3

Google H-Index : 7

H-INDEX

WoS H-Index : 0

Scopus H-Index : 3

Google H-Index : 7

GS Documents

Source by Sinta Kemenristek

Total : 185

Comparison Analysis Between Traditional and Long Segment Contracts on National Road Preservation Activities in Indonesia.
Engineering, Technology & Applied Science Research 9 (3), 2019
RP Winanri, B Susanti, I Juliantina
Citation : 5
Year : 2019
Analisa Durasi dan Biaya Pembangunan Gedung Menggunakan Metode Fast Track
Studi Kasus: Gedung Loka Kesehatan Masyarakat Palembang). Tugas Akhir …, 2019
N Jonanda
Citation : 5
Year : 2019
Implementasi Last Planner System Pada Proyek di Palembang (Studi Kasus Proyek Rusunami Jakabaring)
Jurnal Rekayasa Sipil 15 (1), 43-56, 2019
E Khoirunnisa, MF Toyfur, B Susanti
Citation : 4
Year : 2019
ANALISIS DURASI DAN BIAYA PEMBANGUNAN GEDUNG MENGGUNAKAN METODE FAST-TRACK (STUDI KASUS: GEDUNG LOKA KESEHATAN MASYARAKAT PALEMBANG)
Sriwijaya University, 2019
N Jonanda, B Susanti, MF Toyfur
Citation : 4
Year : 2019
Road Asset Management System Dalam Penanganan Long Segment Jalan Nasional (Studi Kasus: Batas Kota Sekayu–Mangun Jaya)
Applicable Innovation of Engineering and Science Research (AVoER), 806-815, 2019
M Pataras, E Kadarsa, B Susanti, BB Adhitya, D Juliastini
Citation : 4
Year : 2019
The effect of degradation on changes in physical and hydraulic characteristics of organic waste
International Journal Of Scientific & Technology Research 8 (12), 2567-2572, 2019
F Hadinata, B Susanti, M Soraya, AS Silaban
Citation : 4
Year : 2019
Financial feasibility analysis of cost and traffic volume: Case study on toll road investment project
Engineering and Applied Science Research 49 (3), 308-315, 2022
M Wraharjo, B Susanti, E Kadarsa
Citation : 4
Year : 2022
Analisis durasi dan biaya pembanguan gedung menggunakan metode fast-track (studi kasus: gedung loka kesehatan masyarakat Palembang)
Fakultas Teknik Universitas Sriwijaya, 2019
N Jonanda
Citation : 4
Year : 2019
Financial feasibility analysis of cost and traffic volume: Case study on toll road investment project.
Engineering & Applied Science Research 49 (3), 2022
M Wraharjo, B Susanti, E Kadarsa
Citation : 4
Year : 2022
Sapitri,-, Susanti, B., & Soemardi, BW (2018). Risk in Government’s Estimate for Toll Road: Based on Investors’ Perspective
International Journal on Advanced Science, Engineering and Information …
RD Wirahadikusumah
Citation : 3
Year : 0