GS Documents
Source by Sinta Kemenristek
Total : 185
Comparison Analysis Between Traditional and Long Segment Contracts on National Road Preservation Activities in Indonesia. Engineering, Technology & Applied Science Research 9 (3), 2019 RP Winanri, B Susanti, I Juliantina Citation : 5 Year : 2019 |
Analisa Durasi dan Biaya Pembangunan Gedung Menggunakan Metode Fast Track Studi Kasus: Gedung Loka Kesehatan Masyarakat Palembang). Tugas Akhir …, 2019 N Jonanda Citation : 5 Year : 2019 |
Implementasi Last Planner System Pada Proyek di Palembang (Studi Kasus Proyek Rusunami Jakabaring) Jurnal Rekayasa Sipil 15 (1), 43-56, 2019 E Khoirunnisa, MF Toyfur, B Susanti Citation : 4 Year : 2019 |
ANALISIS DURASI DAN BIAYA PEMBANGUNAN GEDUNG MENGGUNAKAN METODE FAST-TRACK (STUDI KASUS: GEDUNG LOKA KESEHATAN MASYARAKAT PALEMBANG) Sriwijaya University, 2019 N Jonanda, B Susanti, MF Toyfur Citation : 4 Year : 2019 |
Road Asset Management System Dalam Penanganan Long Segment Jalan Nasional (Studi Kasus: Batas Kota Sekayu–Mangun Jaya) Applicable Innovation of Engineering and Science Research (AVoER), 806-815, 2019 M Pataras, E Kadarsa, B Susanti, BB Adhitya, D Juliastini Citation : 4 Year : 2019 |
The effect of degradation on changes in physical and hydraulic characteristics of organic waste International Journal Of Scientific & Technology Research 8 (12), 2567-2572, 2019 F Hadinata, B Susanti, M Soraya, AS Silaban Citation : 4 Year : 2019 |
Financial feasibility analysis of cost and traffic volume: Case study on toll road investment project Engineering and Applied Science Research 49 (3), 308-315, 2022 M Wraharjo, B Susanti, E Kadarsa Citation : 4 Year : 2022 |
Analisis durasi dan biaya pembanguan gedung menggunakan metode fast-track (studi kasus: gedung loka kesehatan masyarakat Palembang) Fakultas Teknik Universitas Sriwijaya, 2019 N Jonanda Citation : 4 Year : 2019 |
Financial feasibility analysis of cost and traffic volume: Case study on toll road investment project. Engineering & Applied Science Research 49 (3), 2022 M Wraharjo, B Susanti, E Kadarsa Citation : 4 Year : 2022 |
Sapitri,-, Susanti, B., & Soemardi, BW (2018). Risk in Government’s Estimate for Toll Road: Based on Investors’ Perspective International Journal on Advanced Science, Engineering and Information … RD Wirahadikusumah Citation : 3 Year : 0 |