GS Documents
Source by Sinta Kemenristek
Total : 157
IMPLEMENTASI CONTRACTOR SAFETY MANAGEMENT SYSTEM (CSMS) DI PT. PLN (PERSERO) SEKTOR PENGENDALIAN PEMBANGKITAN KERAMASAN TAHUN 2018
Sriwijaya University, 2018
NA CAHYANI, A Camelia
Citation : 0
Year : 2018 |
ANALISIS DETERMINAN KELUHAN MUSCULOSKELETAL DISORDERS (MSDs) PADA SUPIR BUS PERUSAHAAN OTOBUS (PO) INDONESIA MULIA INDAH (IMI)
RF SITANGGANG
Citation : 0
Year : 0 |
Relationship of Air Quality in Workers and Characteristic of Workers with Sick Building Syndrome in Mall
KEMAS: Jurnal Kesehatan Masyarakat 16 (1), 1
PD Simatupang, DN Santi, I Marsaulina
Citation : 0
Year : 2020 |
PERANCANGAN EMERGENCY RESPONSE PLAN (ERP) DI APARTEMEN UNIVERSITAS SRIWIJAYA
Sriwijaya University, 2019
A RANDIKA, A Camelia
Citation : 0
Year : 2019 |
ANALISIS IMPLEMENTASI PERMIT TO WORK DI LINGKUNGAN KERJA RUANG TERBATAS (CONFINED SPACE) PT. PUPUK SRIWIDJAJA PALEMBANG TAHUN 2019
Sriwijaya University, 2019
CI LESTARI, A Camelia
Citation : 0
Year : 2019 |
IMPLEMENTASI PROSEDUR BEKERJA DI KETINGGIAN (WORKING AT HEIGHT) DI PT PUPUK SRIWIDJAJA PALEMBANG
Sriwijaya University, 2019
F AULIA, A Camelia
Citation : 0
Year : 2019 |
HUBUNGAN WHOLE BODY VIBRATION DENGAN KELUHAN LOW BACK PAIN PADA OPERATOR ALAT BERAT DI PT. X
Doctoral dissertation, Sriwijaya University, 2020
LA PUTRI, A Camelia
Citation : 0
Year : 2020 |
ANALISIS RISIKO HAZARD AND OPERABILITY STUDY (HAZOPS) PADA PROSES PLANT STASIUN PENGUMPUL GAS (SPG) XI LEMBAK PT PERTAMINA EP ASSET 2 PRABUMULIH FIELD
Sriwijaya University, 2020
O OLIVIA, A Camelia
Citation : 0
Year : 2020 |
Reliability Evaluation of Emergency Reponse Plan Design in Buildings of Sriwijaya University 2019
F Febry, A Camelia, P Fujianti, A Randika
Citation : 0
Year : 2020 |
ANALISIS IMPLEMENTASI MANAJEMEN KESELAMATAN RADIASI SINAR X DI INSTALASI RADIOLOGI RUMAH SAKIT UMUM DAERAH PALEMBANG BARI TAHUN 2020
Sriwijaya University, 2020
M AGISTA, A Camelia
Citation : 0
Year : 2020 |