photo
photo

BOCHORI

Teknik Pertambangan

NIDN/NIDK : 0025107401

Asisten Ahli

BOCHORI

Teknik Pertambangan

NIDN/NIDK : 0025107401

Asisten Ahli

H-INDEX

WoS H-Index : 0

Scopus H-Index : 1

Google H-Index : 3

H-INDEX

WoS H-Index : 0

Scopus H-Index : 1

Google H-Index : 3

GS Documents

Source by Sinta Kemenristek

Total : 149

PERENCANAAN DESAIN MAIN SUMP PIT LSA BALANGAN COAL PT LASKAR SEMESTA ALAM KABUPATEN BALANGAN KALIMANTAN SELATAN
Sriwijaya University, 2020
F FAQIH AL HAQUE, A A Taufik, B Bochori
Citation : 0
Year : 2020
REDESAIN SEQUENCE PENAMBANGAN LIMESTONE DENGAN PARAMETER KUALITAS RCO3 79% DI BATURAJA 2 PT SEMEN BATURAJA (PERSERO) TBK SUMATERA SELATAN
Sriwijaya University, 2020
N NURFITRIANI, H Rr Harminuke Eko, B Bochori
Citation : 0
Year : 2020
PERENCANAAN DESAIN PIT PENAMBANGAN BATU KAPUR TAHUN 2020 DENGAN TARGET PRODUKSI 2.300. 000 TON DI TAMBANG BATURAJA I PT SEMEN BATURAJA (PERSERO) TBK
Sriwijaya University, 2020
LF SARI, M Hasjim, B Bochori
Citation : 0
Year : 2020
STUDI BIAYA PENGUPASAN OVERBURDEN PER BCM PADA PENAMBANGAN ELEKTRIFIKASI DI PIT 2 BANKO BARAT PT BUKIT ASAM TBK TANJUNG ENIM SUMATERA SELATAN
Sriwijaya University, 2020
MI RAMADHAN, A Rahman, B Bochori
Citation : 0
Year : 2020
PERENCAAN SISTEM PENGANGKUTAN DENGAN MENGGUNAKAN ALAT GALI EXCAVATOR DOOSAN DAN ALAT ANGKUT DUMP TRUCK DAEWOO UNTUK MEMENUHI TARGET PRODUKSI BATUBARA YANG DIINGINKAN DI PT …
Universitas Sriwijaya, 2019
O LIANDY, MH Hasjim, B Bochori
Citation : 0
Year : 2019
STUDI SEQUENCE PENAMBANGAN PT MEARES SOPUTAN MINING DALAM MENCAPAI PRODUKSI 347.850 TON BIJIH TERTAMBANG PADA SEMESTER 2 DI PIT TOKA, TOKATINDUNG GOLD MINE PROJECT, LIKUPANG …
Sriwijaya University, 2018
UR PULUKADANG, S Komar, B Bochori
Citation : 0
Year : 2018
ANALISIS PENGATURAN WAKTU TUNDA OPTIMUM ANTAR LUBANG LEDAK MENGGUNAKAN METODE SIGNATURE HOLE UNTUK MENDAPATKAN NILAI PPV≤ 3 MM/S DI PIT PINANG SOUTH PT. KALTIM PRIMA COAL …
Sriwijaya University, 2017
G KURNIAWAN, B Bochori
Citation : 0
Year : 2017
ANALISIS KETIDAKTERCAPAIAN DAN UPAYA MEMENUHI TARGET PRODUKTIVITAS EXCAVATOR PC-3000 DI PIT 2 BANKO BARAT PT BUKIT ASAM, TBK. TANJUNG ENIM SUMATERA SELATAN
Sriwijaya University, 2023
M DIKA, MT Toha, B Bochori
Citation : 0
Year : 2023
ANALISIS KETERCAPAIAN PENGUPASAN OVERBURDEN DI PIT LAWAI 1, PT BUDI GEMA GEMPITA, LAHAT, SUMATERA SELATAN
Sriwijaya University, 2023
MAL AMIN, M Asyik, B Bochori
Citation : 0
Year : 2023
EVALUASI GEOMETRI PELEDAKAN TERHADAP FRAGMENTASI HASIL PELEDAKAN LAPISAN OVERBURDEN BATUBARA, LOADING TIME ALAT GALI MUAT, DAN RECOVERY PELEDAKAN

BBPTBA TBK, JTPDAN GEOLOGI
Citation : 0
Year : 0